Terms and Conditions

Terms and Conditions

Terms & Conditions
Price:-
  • Quoted prices are applicable for this proposal only, any modifications may result in a change of prices.
  • The quoted rates are an estimate based on current design and sizes.
  •  Designs are liable to change till the sign off the design phase.
  • Depending on the exact actual measurements on the site prices may change.
  • Deep cleaning for your home post-handover can be provided by Asense at an extra cost as below:
» 2bhk = Rs. 7500 + taxes
» 3bhk = Rs. 9000 + taxes
» >3bhk = @ 8Rs. per sft on SBA.
  •  Floor covering of your existing flat will be charged extra at Rs. 8 per sft/ this will be done by default by Asense added to your bill at the time of going to production as per actual site measurements.
  • Painting and light suggestion will only be given if you book the same services with us.
  •  High Quality 3D Render services can be provided by Asense on extra cost.
  • If service lift isn’t operational then uplifting charges of 10000 rs. will be applicable till 5th floor. Beyond that as per floor count charges will be applicable.
  • Any lamination beyond the price of 1000 rs/sheet. will be charged extra.
  •  Soft closer hinz & channel will be charged extra.
  • Any extra accessories, Carcass top, lights, electrical materials, Point shifting or any other extra work will be charged as per actual.
  • Based on Design Rates May differ for each and every Unit.
  • PVC Sheet, Veneer, Digital Lamination, Lacquer Glass and Acrylic sheet will be charged extra as per the actual rate.
  • All kind profile handle, Profile shutter cost will be charged extra.
  • Extra Drawer/Basket Or any other accessories will be charged extra as per actual.
  • Time of installation all the internal house wall may get some damages and for that you need to do one coat of painting after completion of woodwork.
  • Asense is able to process your final order and start production only post a 55% payment, Key and work permission letter.
Below work can be done at extra cost:-
  • Civil work (Breaking existing partitions, walls or counters making)
  • Plumbing material & services
  • Electrical points shifting
  • Electrical Appliances and/or installation
  • Chimney installation & ducting
  • Wall tiles and installation
  • Cornice / Moldings & Pelmet
  • Kitchen & Cabinet Spotlights
  • Hanging accessories
  • Copper gas pipe and installation
  • False Ceiling and Furniture lights
  • Stone Work
  • Wall Core Cutting
  •  Deep Cleaning
Production & Installation Schedule:-
Project Value Buffer time in-between after design finalization to start the Production Total Project Timeline till handover for estimated work Painting & other works
6-8 lac 7 working days 45 working Days 8-10 working Days
8-12 lac 7 working days 55 working Days 10-12 working Days
12-15 lac 7 working days 65 working Days 15-17 working Days
15-20 lac 7 working days 75 working Days 18-20 working days
20-25 lac 7 working days 85 working Days 25 working days

*Asense will keep 15 working days of buffer time for unconditional foreseen situations.

 *Asense won’t be responsible for any delay in project implementation due to third party vendors or for reasons beyond its control.

 